- Opened
- Closed
- Description
- No work shall be performed in the Right of Way without first having a pre-construction meeting with Development Services Field Inspection Team. Additionally, the resident engineer shall be notified of any planned construction activities at least two working days prior to commencing per SDMC 62.1109 (b).
- Location
-
1351 Brunner St, San Diego, CA 92110, USA
32.7693484, -117.1896561
CLOSED
#05819771
It was evaluated and determined that no action is warranted at this time.
Activity
-
Submitted
Opened
Closed